A 6 kW fiber laser in a one-shift California job shop costs about $67 per hour of cutting, before labor, gas, and material. Work out yours step by step.

Feinerfab team20 min readNovember 23, 2026
Download XLSX template

If you’re a shop owner offering metal laser-cutting services, one of the most important questions to answer is: “How much should I charge for my work? What is my hourly rate? What does it cost to open my door every day?” Many shop owners price by experience, and experience is worth a lot. This article gives you a second check: the cost of one hour on your fiber laser, worked out from your own numbers.

If your net margin is 10%, raising the price by 20% would mean 3X more in net profit on the same orders: a moderate adjustment can make a huge difference on the bottom line. And you can look at your cash flow month by month and think everything is fine until it’s time for major maintenance or a machine replacement, and you realize you have no money for it.

Pricing strategy may differ depending on your business and market specifics. Your customers don’t care what your laser costs you, and often the market sets the price. But even then, it is extremely important to understand your costs clearly: they tell you whether a job is worth turning the lights on for.

The number you’re after: the machine hour rate

The machine hour rate is what one hour of cutting costs you, before labor, assist gas, and material. It is not your shop rate, the price per hour you charge customers. At a high level, it comes from two components: fixed costs and running costs.

Fixed costs are what you pay regardless of whether the machine is powered on or off. They include components like equipment depreciation, interest, rent, committed contracts, and property tax.

The running costs come only when the laser actually runs: electricity, consumables, wear parts, and repairs.

Machine hour rate = Fixed cost per hour + Running cost per hour

$54.84+$11.72=$66.56 per hour

We’re going to break down the various components of the cost in the following sections. Example values are based on a job shop with one 6 kW Chinese-brand fiber laser cutter operating in California’s Central Valley. You can put your specific numbers into the interactive widget and see how all the calculations are immediately adjusted in it and the formula example blocks.

How many hours does the laser actually work?

Before calculating the fixed costs, you need to know how many hours the machine actually works. This is necessary because those costs are spread over hours to get a meaningful rate you can operate with. The best efficiency is reached when a machine runs 24/7, 365 days a year, with no rest or maintenance. This is, of course, not possible, and you likely have shifts of 6–9 hours and closed weekends.

Planned hours

Planned hours are the hours the shop is staffed and the laser is available: the length of a workday times the number of workdays in a year. When counting workdays, exclude public holidays, and if the workshop closes while you’re on vacation or sick leave, subtract those days too.

For example, if your workshop is open Monday to Friday, eight hours a day, stays open while you’re on leave because an employee covers for you, and closes on 11 public holidays, the planned hours are 8 hours × (52 weeks × 5 days − 11 days) = 1,992 hours.

Planned hours per year = Workday duration × Workdays per year

×249 days=1,992 hours

Machine hours and utilization

No laser cuts through every planned hour. First, subtract downtime days, the days lost to maintenance and breakdowns. After that, you need to apply the utilization — the share of the remaining time the machine is actually running the program. The result is machine hours: the hours the laser runs a program, including moves between contours and piercing, but not the hours it is switched on while idle. Utilization depends on workflow “imperfections,” such as time spent on load/unload/setup/preparations and changing consumables, and your expectations about order inflow.

For example, if you have 1,992 hours planned a year with seven workdays of machine downtime (eight hours a day) and 30% utilization, the resulting machine hours are (1,992 hours − 7 days × 8 hours) × 30% = 581 hours, which are noticeably lower than the original planned 1,992 hours. Don’t mix these two values.

Machine hours per year = (Planned hours − Downtime days × Workday duration) × Utilization

(1,992 hours−×)×=581 hours
Try a different utilization

Utilization moves the result significantly. In our example, an hour of cutting costs about $95 at 20% and about $32 at 75%. According to The Fabricator, utilization of a stand-alone laser without load automation is typically 30–40%, and 50% is very good.[1] If you don’t track it yet, a week of notes on machine status gives a usable first estimate. Many machines have invaluable data in their memory: check whether you can access total run time on the machine controller. It may be called “processing time,” “nest run-time,” “cycle time,” or “beam-on time.” Check what your controller actually counts. If it is there, divide that time value by the planned hours of the same period, minus downtime.

Fixed costs: what you pay even when the laser is idle

Fixed costs are made up of several expense components that are easy to overlook. Some of these expenses happen rarely but require large payments at once, and if you don’t account for them, they can cause trouble when it’s time to pay the bills.

To make these large payments manageable, first calculate their annual value, then spread it over machine hours, so every job pays its share.

Let’s break down the components that make up yearly fixed cost.

Depreciation

Your laser machine was probably your biggest investment in the shop, and it’s not eternal: it has to earn, at the very least, enough to replace it with a new one when the time comes. Even if the machine is already paid off or written off for taxes, keep depreciation in your calculations.

First, you need two known figures: (1) the total price of the machine with all the accessories, delivery, commissioning, and sales tax; (2) site preparation, the expenses related to preparing the property specifically for the machine, such as floor leveling, three-phase electricity wiring, lighting around, etc. If you’re just planning to buy a laser, note that converting a building to three-phase power typically adds $10,000–30,000 to the electrical work.[2] If the building also has too little power for the laser, the upgrade costs more on top.

The general idea is to spread these expenses over the machine’s economic lifetime. It’s not the lifetime after which you have to replace it, but a modeled value that explains how long the machine can stay competitive with other workshops. Older machines require more maintenance (and thus downtime) and, as technology advances, lose performance to newer models. A reasonable economic lifetime is five to ten years.

One more component to figure out is the salvage value after the economic lifetime. You can scrap the machine after its lifetime, but you can more likely still sell it. If the machine model is old enough to be already sold used, you can pick the value from those offers based on the condition the machine should be in at the end. If the model is new, it’s harder to estimate, but you can assume how much a similar model (by brand and price) loses over time. The salvage value doesn’t affect the result much, so a mistake here won’t distort the numbers dramatically.

Example: you buy the machine with an all-inclusive deal of $114,900 (chiller, dust collector, transformer, delivery, installation, and training) plus $5,070 sales tax, $119,970 in total; you pay $5,640 to wire the machine to your three-phase panel and level the floor under it; you decide to depreciate the laser over eight years and expect its market price to be ~$35,000 by then.[3] In this case, annual depreciation is ($5,640 + $119,970 − $35,000) ÷ 8 years = $11,326.

Depreciation per year = (Site preparation + Purchase price − Salvage value) ÷ Economic life

(+−)÷=$11,326 per year

Interest on tied-up capital

Instead of buying the machine and preparing the site, you could invest that money in a bank deposit or buy bonds (for example, 4.8% a year on 7-year US Treasury notes)[4] to earn a return. If, over its lifetime, the machine brings back only its initial price, the net result isn’t even zero; it’s negative: the same money in a deposit would have earned interest all those years. Interest on tied-up capital is the return you give up by putting money into the machine.

Interest per year = Interest rate × (Purchase price + Site preparation + Salvage value) ÷ 2

×(++)÷ 2=$3,855 per year

You might wonder why the salvage value is added, not subtracted, and what the “2” in the denominator means. This formula computes the average capital frozen in the machine.[5] As time goes by, the machine pays for itself uniformly, from the purchase price and site preparation at the start down to the salvage value at the end, so we apply interest to the average value. You can play with the numbers and see that increasing the salvage value raises the interest, but it also lowers depreciation by a larger amount.

If you took a loan for the machine, use the loan’s interest rate. Don’t add the loan payments on top: depreciation already returns the price, and the formula above covers the interest. If you lease the machine, use its lease payments instead of depreciation and interest (the depreciation and interest of other costs, like site preparation, stay).

Floor space

A machine requires space to run. That space is usually rented and shows up as a tangible monthly bill. Even if you’re lucky and own the property, use market rent in your calculations because you could make revenue by using the floor differently, and once you grow into a second building, you’ll pay rent there, so your prices should already cover it.

Another complexity is that you can’t scale the space you have up and down in small steps: you either rent the whole floor and pay accordingly, or look for another offer. You need to attribute every square foot to a zone it is allocated for:

  • Machine footprint, chiller, dust collector, loading and service clearance — go to machine rate
  • Sheet storage used only by this laser — goes to machine rate
  • Sheet storage shared by a few machines — split evenly
  • Packing and finished goods zone, office and customer area, space rented for growth and empty — overhead, excluded

Include all property-related expenses in the property cost: rent, utility bills (other than electricity consumed by machines), cleaning contracts, and typical property maintenance costs. Once you know the actual machine area, multiply it by the yearly rate per square foot to get the number we’re looking for.

For example, you’re renting 1,404 ft² of space, and your property cost with utilities and small repairs is $1,617 per month. You have one laser, and the machine zone plus its storage takes 600 ft². Then, the floor space per year for the machine is: $1,617 × 12 months ÷ 1,404 ft² × 600 ft² = $8,292.

Floor space per year = Property cost per month × 12 ÷ Rented area × Machine area

× 12 months ÷×=$8,292 per year

Service contract, insurance, software

You also pay some bills no matter how much you cut: the service contract, insurance, and software. Convert expenses to a yearly basis and add them to other components to get the final fixed-cost figure.

Most machines come with a software license included, but you might need something special depending on your business. If so, include the yearly subscription cost. If you got a perpetual license, split it over its economic life in years, as we did for the machine itself.

For example, the service contract costs $6,100 a year (some warranties stay valid only if an authorized technician does the preventive maintenance), and insuring the machine adds $1,236 a year. The software came with the machine, so it adds nothing: $6,100 + $1,236 + $0 = $7,336 a year.

Service contract, insurance, software per year = Service contract + Insurance + Software

++=$7,336 per year

Property tax

In California, the county taxes business equipment every year, even if you wrote it off for income taxes. The assessor sets the machine’s value as of January 1 from its cost and age, and the tax rate is the same as for real estate at that address.

Example: in the City of Fresno the rate is about 1.29%, and over eight years the machine’s value averages about 68% of its cost: 1.29% × 68% × $119,970 = $1,052 a year.

Fixed costs wrap-up

Now you have all the components to calculate the final annual costs.

Fixed cost per year = Depreciation + Interest + Floor space + Service contract, insurance, software + Property tax

$11,326+$3,855+$8,292+$7,336+=$31,861 per year

Divide by the number of machine hours to get the hourly fixed cost.

Fixed cost per hour = Fixed cost per year ÷ Machine hours per year

$31,861÷581 hours=$54.84 per hour

For smaller shops with low machine utilization and a single shift, this component contributes the most to the final number.

Running costs: what each cutting hour consumes

Running costs scale with machine hours. Electricity, consumables, wear parts, and repairs each have their own unit, so we turn each into dollars per machine hour. Let’s do this one by one.

Electricity

Use the average draw while working, including the chiller and dust collector. If you cut with air, leave the air compressor out: different materials require different gases and equipment, so it’s better to compute and add them separately from the machine cost. You can determine consumption from a dedicated submeter or clamp-on energy monitor for a typical week (kWh ÷ machine hours). Note that the meter counts the whole week, including the time the chiller and dust collector run while you load and unload sheets, so the idle power is already spread over the per-machine-hour result. Alternatively, use the common electric meter and log total floor consumption when the machine is inactive versus a similar period when the laser is running to understand the difference the machine causes.

Next, determine the average tariff. The contract likely isn’t as simple as $/kWh, but we need that number to compute running cost. The simplest way to understand it is to get a few recent utility bills from when you operated normally and divide the total amount charged, with all fees and any demand charges, by the total kilowatt-hours (kWh) consumed.

Example: you’ve paid $877 for 2,417 kWh consumed last month. The average tariff is $877 ÷ 2,417 kWh = $0.36 per kWh.

Now you have everything you need to compute the electricity cost. For example, the 6 kW laser machine with all the accessories draws about 22 kW on average per machine hour. The 6 kW is only the power of the beam: the laser source draws much more to make it, and the chiller, the drives, and the dust collector add their part. Then, the final cost is $0.36 per kWh × 22 kW = $7.92 per hour.

Electricity per hour = Average tariff × Average power draw

×=$7.92 per hour

Consumables and wear parts

Many parts are known and limited resources. Whether they need replacing every few weeks or every few years, they shouldn’t be a surprise.

On a fiber laser machine, you often have to replace consumables: protective windows and nozzles. Thankfully, they are cheap.[6] Focusing lenses cost more but have a long lifetime. And the cutting head is a wear part with a really long service life that probably outlives a new machine before it is sold, but a crash can end it early, and a new head costs thousands of dollars.[7] All these should be accounted for. The cutting head is especially important if you bought the machine used.

How long windows, nozzles, and lenses last depends on what you cut, how often you pierce, and how often the head hits a part. To get your own numbers, divide last year’s machine hours by the number of each part you bought.

Part cost per hour = Part price ÷ Part life in machine hours

Protective window
÷=$0.80 per hour
Nozzle
÷=$0.08 per hour
Focusing lens
÷=$0.26 per hour
Cutting head
÷=$0.40 per hour

Repairs outside the service contract

It happens; machines break down. Your best source of knowledge is your own experience with the vendor and model, along with forums and communities that share personal experience so you know what to expect.

The exact amount you have to pay for unforeseen failures is generally unknown, but a rough estimate helps you prepare and keep the business healthy in the long run.

For example: you expect almost no paid repairs in the first five years because the vendor warranty covers the most expensive parts: the laser source, the cutting head, and the control system. Then, you reserve $3,500 for each of the remaining three years of the machine’s lifetime and set it aside over all eight years. The hourly cost will be: $3,500 × (8 − 5 years) ÷ 8 years ÷ 581 hours = $2.26 per hour.

Repairs per hour = Yearly repairs after warranty × (Economic life − Warranty) ÷ Economic life ÷ Machine hours per year

×(−)÷÷581 hours=$2.26 per hour

Keep in mind that this is an average. If the laser source fails after the warranty, a new 6 kW one alone costs about $12,500–15,900.[8]

Running costs wrap-up

Now you can sum up the components of running costs to get their total.

Running cost per hour = Electricity + Protective window + Nozzle + Focusing lens + Cutting head + Repairs

$7.92+$0.80+$0.08+$0.26+$0.40+$2.26=$11.72 per hour

If you’re a small workshop, running costs are usually lower than fixed costs, but they still contribute significantly and shouldn’t be ignored.

Bottom line: what a machine-hour costs

You’ve figured out the two components of the machine hour rate: the fixed part and the running part. Now, add them up to get your machine’s final rate.

Machine hour rate = Fixed cost per hour + Running cost per hour

$54.84+$11.72=$66.56 per hour
Example: the machine hour rate by component
CostPer yearPer hour
Fixed costs
Depreciation$11,326$19.49
Interest$3,855$6.64
Floor space$8,292$14.27
Service contract, insurance, software$7,336$12.63
Property tax$1,052$1.81
Total fixed costs$31,861$54.84
Running costs
Electricity$4,602$7.92
Protective window$465$0.80
Nozzle$46$0.08
Focusing lens$151$0.26
Cutting head$232$0.40
Repairs outside the service contract$1,313$2.26
Total running costs$6,809$11.72
Total$38,670$66.56

To get a job’s machine cost, multiply the rate by the job’s estimated machine time. Do not use the whole time the job keeps the machine busy. Loading, unloading, and waiting are already included in utilization, so the rate already covers them.

Software often shows this time in minutes, so the rate per minute is handy too.

Machine rate per minute = Machine hour rate ÷ 60

$66.56÷ 60=$1.11 per minute

From machine hour rate to a price

The machine hour rate is one of your costs, not your price. To get the price, add:

  • Labor: programming, setup, loading, and sorting parts, at your labor rate
  • Assist gas: oxygen, nitrogen, or air, depending on the material of the parts in the job (for air, the compressor’s electricity, filters, and oil)
  • Material: the sheets, including the scrap around the parts and remnants you cannot reuse
  • Overhead: the office, sales, and the floor space outside the laser zone
  • Profit: what you keep or invest in growth
  • A minimum charge, so a five-minute job still pays for quoting, setup, and invoicing

Your price per cutting hour, without material, will likely be several times the machine hour rate. As a check, compare it with shop rates in your region.

If you priced by experience or only by cut length before, these numbers give you a second check on every quote.

Downtime: what a lost day costs

One more calculation: what if the machine went out of service unexpectedly? What if the power went out? What if you had to pause for a couple of months? How much does it cost? In this period, you have no running costs, but the fixed costs still apply, with no work to pay for them. Each day you’re down beyond your planned downtime costs you this much, and you lose that day’s profit too.

Downtime cost per day = Fixed cost per hour × Workday duration × Utilization

$54.84××=$131.62 per day

For example, a part for your laser ships from overseas and takes three weeks to arrive. That’s 15 workdays × $131.62 = $1,974 with no work to pay for it, plus three weeks of profit, even if the warranty covers the part itself. Spare parts on the shelf cost money too, but often less than the wait. And if you’re still choosing a laser, ask the seller who fixes it and how fast parts arrive.

Work out your machine hour rate again each year, or when something big changes: rent, electricity prices, a second shift, or a new machine. Best of luck with your endeavor!

Quote every DXF at your own rate

Once you know your price per cutting hour, Feinerfab applies it to every file your customers upload and every product they configure. It measures the cut length, counts the pierces, and uses your machine speeds for each material. The price shows right away, worked out from your own numbers. No copying figures from CAM software into a spreadsheet. Free for 90 days or 20 orders, whichever comes first, then a monthly plan with no transaction fees.

See pricingBook demo

Sources

  1. ↑ 5 ways to improve your flow of laser-cut parts. Jason LeGrand, The Fabricator, January 4, 2019.
  2. ↑ Cost of upgrading an industrial electrical service. Delta Wye Electric, an electrical contractor in Anaheim, California, opened November 2026.
  3. ↑ The Equipment Hub. Asking prices of similar used machines that sold through this US used machinery dealer, November 2026.
  4. ↑ Daily Treasury Par Yield Curve Rates. U.S. Department of the Treasury, November 20, 2026.
  5. ↑ Farm Machinery Cost Calculations. Jeff Johnson, Mississippi State University Extension, 2020.
  6. ↑ eBay. Listings of new protective windows, nozzles, and focusing lenses for 6 kW cutting heads, November 2026.
  7. ↑ eBay. Listings of new 6 kW auto-focus cutting heads at about $2,100–3,600, November 2026. The example rounds the price up, because the head is bought years later.